Depot Charging Scheme: what fleet operators need to know before 29th January 2027

13 November 2026 8 min read
Surrey County Council, HALO FastHub, 3ti

We’re EV charging specialists and fleet depots are where our experience counts. We know what holds depot projects back: grid capacity, long lead times and kit that can’t adapt when the business changes.

HALO FastHub was built to remove those blockers. It puts 12 charge points on site in a single day, on your existing grid connection, with no planning permission needed in most cases. It’s supported by the sun, built in the UK and can move with you if your depot does. It’s more than a place to plug in. Drivers can pay by contactless, app, roaming or ad-hoc, and every charge point shows a 24/7 support line. It just works.

Funding is open now. Window 2 of the Depot Charging Scheme offers a share of £38m and stays open until midday on 26 February 2027. It funds 60% of charge point and civil costs, with a cap of £1m per organisation across all sites. Applications are first come, first served, so early, complete bids stand the best chance

Our guide covers who can apply, what’s funded and the key dates. It also explains how to build an application that doesn’t stall on grid capacity or delivery deadlines.