Papilio3 for your destination, workplace & fleet
Install & commission in one day
Set your own tariffs for different user groups while we handle the back-office.
Full O&M service, including 24×7 driver support, remote monitoring and management.
Generate up to 18MWh/year, saving £5K–£7K and cutting grid reliance by 30–40%. The solar canopy powers EVs and provides shelter.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla facilisi. Sed tincidunt, lorem a fermentum interdum, metus neque auctor nisi, sit amet pellentesque sapien nulla nec metus. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia curae; Proin at arcu id odio euismod interdum. Curabitur ut diam ac ipsum dictum consequat.
Mauris interdum, metus id tincidunt auctor, justo risus iaculis velit, at gravida eros tortor id justo. Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Integer nec lectus sed felis fermentum dictum. Aliquam erat volutpat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla facilisi. Sed tincidunt, lorem a fermentum interdum, metus neque auctor nisi, sit amet pellentesque sapien nulla nec metus. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia curae; Proin at arcu id odio euismod interdum. Curabitur ut diam ac ipsum dictum consequat.
Mauris interdum, metus id tincidunt auctor, justo risus iaculis velit, at gravida eros tortor id justo. Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Integer nec lectus sed felis fermentum dictum. Aliquam erat volutpat.
On average across our current sites, the rest coming from the electrical grid
Install and commission in 1 day
The 19.32kWp solar array generates clean electricity to power EV charging while providing shelter from weather and reducing carbon emissions by 3.6 tCO2e annually.
Each Papilio3 hub includes 12 x 22kW AC charge points, capable of charging multiple vehicles simultaneously at 7, 11, or 22kW (depending on vehicle on-board charging capability).
Our proprietary OBI technology optimises existing grid connections through smart energy management systems, ensuring reliable charging speeds even with limited power capacity.
Complete peace of mind with remote monitoring, 24/7 driver support, regular reporting, and proactive maintenance handled by our expert team.
ChargeSafe-accredited, Papilio3 includes CCTV, motion-controlled lighting, and meets PAS1899 standards for accessibility with 2.5m wide parking bays.
Waterproof solar canopy generating 18MWH / year
Twelve 22kW Fast AC Charge Points
Optional media / advertising screens
Sensor controlled smart lighting & CCTV
Protected plant room with 3tiG controls
Optional battery of up to 500kWh
Why struggle with complex infrastructure when you could have 12 charge points installed in a day? Contact us today for a free site assessment and see how Papilio3 can deliver immediate EV charging with long-term benefits.
Waterproof solar canopy generating 18MWH / year
Twelve 22kW Fast AC Charge Points
Optional media / advertising screens
Protected plant room with 3tiG controls
Sensor controlled smart lighting & CCTV
Optional battery of up to 500kWh
Waterproof solar canopy generating 18MWH / year
Twelve 22kW Fast AC Charge Points
Optional media / advertising screens
Sensor controlled smart lighting & CCTV
Protected plant room with 3tiG controls
Optional battery of up to 500kWh
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Surrey County Council (SCC) is the second UK local authority to install Papilio3 at its Merrow Depot near Guildford.
The installation supports SCC’s sustainability goals by enabling fleet electrification using renewable solar energy.
Successfully installed in a space-restricted area while adapting to uneven terrain, it enables both fleet and staff vehicles to charge around-the-clock, ensuring continuous operation without long wait times.
Surrey County Council (SCC) is the second UK local authority to install Papilio3 at its Merrow Depot near Guildford.
The installation supports SCC’s sustainability goals by enabling fleet electrification using renewable solar energy.
Successfully installed in a space-restricted area while adapting to uneven terrain, it enables both fleet and staff vehicles to charge around-the-clock, ensuring continuous operation without long wait times.
It is an amazing thing to see it go up so quickly. It has probably been 6 hours since I arrived here, and I am charging. That is pretty impressive when these things usually take months…
– Robert Llewellyn, Host of the Everything Electric Show on the deployment at the University of Surrey
The force’s target is to be Net Zero for all scope 1 and 2 emissions by 2040, and it is hoped exploring the use of technology such as this – which uses solar panels on its roof – will help us achieve that.
Keith Dickinson,
Director of Resources, Merseyside Police
As a leader in the renewables sector, we are committed to setting an example by using innovative solutions to reduce our carbon footprint. At the same time, we aim to ensure that students have a rewarding and positive experience during their time at the Academy. Providing a convenient and sustainable onsite EV charging solution will help us achieve that goal.
James Galloway
Global Product Director at Segen Ltd
Our Shift to Zero initiative is well underway as we strive to improve sustainability across the venue. We are always looking at ways to further reduce our carbon footprint, and installing solar-powered EV charging was an obvious step.
Stuart Pringle
Managing Director at Silverstone
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nulla facilisi. Sed tincidunt, lorem a fermentum interdum, metus neque auctor nisi, sit amet pellentesque sapien nulla nec metus. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia curae; Proin at arcu id odio euismod interdum. Curabitur ut diam ac ipsum dictum consequat.
Mauris interdum, metus id tincidunt auctor, justo risus iaculis velit, at gravida eros tortor id justo. Pellentesque habitant morbi tristique senectus et netus et malesuada fames ac turpis egestas. Integer nec lectus sed felis fermentum dictum. Aliquam erat volutpat.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Lorem ipsum dolor sit amet, consectetur adipiscing elit.
Feasibility Study
Tell us about your location and requirements. Our team will assess your existing grid connection, car park layout, and EV charging needs to ensure Papilio3 is right for your site.
Feasibility Study
Tell us about your location and requirements. Our team will assess your existing grid connection, car park layout, and EV charging needs to ensure Papilio3 is right for your site.
We’ll deliver, install and commission your Papilio3 within 24 hours with minimal disruption. From arrival to charging-ready in just one day.
Start charging immediately with your solar-assisted hub. Enjoy complete control over tariffs while we handle monitoring, maintenance, and driver support to ensure reliable operation.